Slide: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

After the rainy season in the spring of 2000, you can see the water on the blocks. The roof superstructure is in place, but still needs permanent materials. Also needed is a floor.

RETURN TO SANTA MARIA DEL REAL REPORT

http://www.bobyoungresources.com/missions/smdrroof1.htm
Last updated February 9, 2001.